18 Sept 2026 Site
Shared problem-page design shipped The 20 technology pages now use shared Plain and Engineer sections, with figures selected from each record's data.
Observed and target states stay explicitly marked, and source links can open the relevant evidence, figure, history or builder record.
Open a problem page ↗ 3 Sept 2026 Site
Problem pages use shared sections The site moved to a modular page contract so the same evidence sections can serve every technology.
The AGI page no longer has a problem-specific section fork; section numbers derive from the sections a record actually renders.
Open a problem page ↗ 3 Sept 2026 Data
Steward figures became re-pullable Steward-owned numbers are regenerated from their source files so a cached estimate cannot quietly become the new record.
The ingest registry now wires the METR steward source through its own ingester; other sources remain explicitly separate.
See the sourced ruler ↗ 3 Sept 2026 Data
The frontier claims register opened Model claims now carry their benchmark, conditions, verification state and primary source in one register.
A hollow mark means the lab reported the number. A solid mark means a named steward checked it.
Inspect the frontier ↗ 3 Sept 2026 Site
Problem URLs were shortened Technology pages moved from /problems/name to /name, with permanent redirects kept for shared links.
The shorter address is canonical while the old address remains safe to follow.
Browse the register ↗ 3 Sept 2026 Site
Rulers became a shared section Independent benchmark rulers can now appear on any problem carrying a benchmark record.
The section is data-selected, so adding a ruler set does not require a page-specific component branch.
View a ruler set ↗ July 2026 Site
The first public register opened The site launched with the fusion programme fully researched and five further programmes stubbed.
The launch record described progress estimates as editorial judgments rather than measurements from a universal formula; the methodology was still forthcoming.